Brisbane, California

Permitting, departments, adopted codes, local amendments, and inspection process for the City of Brisbane.

Building Intelligence Knowledge Team Updated 2026-07-28 2 min read
  • Used by Liva AI
  • Used by Blueprint Review
  • Referenced by EIE

Overview

Brisbane is located in San Mateo County with an estimated population of 4,800. The city administers building and planning review locally and coordinates fire review with the county.

Permit portal

Brisbane Online Permit Center

Online application, fee payment, inspection scheduling, and document upload.

Departments

DepartmentResponsibilityTypical turnaround
BuildingPlan check, permits, inspections10–15 business days first review
PlanningZoning, design review, entitlements20–30 business days
FireAccess, suppression, WUI review10 business days
Public WorksEncroachment, grading, utilities15 business days

Applicable codes

  • 2025 California Building Standards Code (Title 24)
  • 2025 CRC / CBC / CEC / CPC / CMC / CFC
  • CALGreen with local amendments

Local amendments

  • Local amendment to CRC roofing class for wildland-urban interface parcels
  • Grading permit required for cut/fill exceeding 50 cubic yards
  • Green building ordinance exceeding CALGreen Tier 1 for new construction

Permit checklist

  1. 1Completed application with scope of work
  2. 2Site plan with setbacks and parcel dimensions
  3. 3Architectural and structural sheets at readable scale
  4. 4Energy compliance documentation
  5. 5Special inspection form where required
  6. 6Owner-builder or contractor verification

Inspection process

  1. 1

    Schedule

    Requests made before 4:00 PM are typically scheduled for the next business day.

  2. 2

    Field inspection

    Approved plans and the permit card must be on site.

  3. 3

    Corrections

    Correction notices are posted to the portal with re-inspection instructions.

  4. 4

    Final

    Final inspection precedes certificate of occupancy where applicable.

Frequently asked questions

Do I need a permit to replace a water heater?+

Yes. A plumbing permit is required, and seismic strapping plus expansion control are verified at inspection.

How long is a permit valid?+

Permits expire if work has not begun within 12 months or if inspections lapse for 180 days.

Can I submit plans digitally?+

Yes. Brisbane Online Permit Center accepts vector PDF submittals that meet the Blueprint Submittal Standards.